Annexation Current Documents

Some of these files are very large and will take a while to download. 

FPASP design guidelines April 2015

Folsom Plan Area Specific Plan Minor Administrative Amendments

Folsom Plan Area Specific Plan Minor Administrative Modification 11/7/17

South of Highway 50 Backbone Infrastructure

Notice of Intent - So. of Hwy 50 Backbone Infrastructure
Initial Study - So. of Hwy 50 Backbone Infrastructure
FPA Recycled Water Analysis - So. of Hwy 50 Backbone Infrastructure
FPA Water System Master Plan - So. of Hwy 50 Backbone Infrastructure
FPA Wastewater Master Plan - So. of Hwy 50 Backbone Infrastructure
So. of Hwy 50 Backbone Infrastructure - FPA Storm Drainage Master Plan - Vol. 1
So. of Hwy 50 Backbone Infrastructure - FPA Storm Drainage Master Plan - Vol. 2

Russell Ranch
Russell Ranch - Final EIR
Russell Ranch - Draft EIR Vol. I

Russell Ranch - Draft EIR Vol. II
Russell Ranch - Draft EIR Vol. III
Russell Ranch Notice of Completion and Availability of Draft EIR
Russell Ranch Errata Sheet, April 8, 2015

Mangini Ranch

Mangini Ranch - CEQA Exemption & Streamlining Analysis 
Mangini Ranch - Folsom Ranch Design Guidelines

White Rock Springs Ranch

White Rock Springs Ranch - Exhibit 1 - Design Guidelines
White Rock Springs Ranch - Exhibit 2 - ROD for Backbone Infrastructure
White Rock Springs Ranch - Exhibit 3 - Air Quality and GHG Assessment
White Rock Springs Ranch - Exhibit 4 - CEQA Biological Resources Mitigation Report
White Rock Springs Ranch - Exhibit 5 - Letter Report on Cultural Resources
White Rock Springs Ranch - Exhibit 6 - Railroad Noise
White Rock Springs Ranch - Exhibit 7 - Traffic Evaluation
White Rock Springs Ranch - Exhibit 8 - FPASP Policy Consistency Analysis
White Rock Springs Ranch - Exhibit 9 - Water Demand Comparison
White Rock Springs Ranch - CEQA Exemption Checklist

Enclave at Folsom Ranch

Enclave at Folsom Ranch - CEQA Exemption & Streamlining Analysis

Folsom Heights

Folsom Heights Addendum 4-4-17

Folsom Plan Area - Superior Court of State of California Judgment Validating Water Supply Agreement -- October 16, 2013

City Council Meeting December 11, 2012

Folsom Plan Area Specific Plan Project - An Addendum to the Environmental Impact Report for the Folsom Plan Area Specific Plan Project for Purposes of Analyzing an Alternative Water Supply for the Project; an Agreement Between the City of Folsom and Folsom Plan Area Landowners for a Water Supply and its Financing and Authorizing the Filing of an Action to Validate the Agreement

Special City Council Meeting December 6, 2011

Property Tax Sharing Agreement between the City and Sacramento Metropolitan Fire District and the City and Sacramento County
Agreement with Stoneridge Quarry 
Agreement Relating to Transportation and Water Supply Issues
Truck Management Plan Agreement


City Council Meeting November 8, 2011

City Council Presentation November 8, 2011 (Folsom Plan Area Specific Plan Project Tax Exchange

Agreements)

Folsom Plan Area Specific Plan (Public Facilities Financing Plan-Addendum)

City Council Presentation April 26, 2011

Area Specific Plan - FINAL
Area Specific Plan - Facilities Financing Plan - DRAFT
Area Specific Plan Summary - DRAFT
Land Use Plan Map 
Section 3A 15 Traffic and Transportation Exhibits
Folsom NOA Final - New Comment Period 
Notice of Inadvertent Omission


EIR/EIS - DRAFT

Appendix
A - Notice of Preparation
B - Comments on Notice of Preparation
C - Air Quality
D - Biological Resources
E - Cultural Resources
F - Geology, Soils, Mineral Resources and Paleontological Resources
G - Hazards and Hazardous Materials
H - Draft Storm Drainage Master Plan

I - Noise Data/Traffic Noise Input/Output Sheets
J - Traffic Level of Service Sheets
K - Utilities
L - 404(b)(1) On-Site Alternatives
M - Water Supply Assessment and Master Plan
N - Folsom Plan Area Specific Plan
O - On-Site Alternatives Analysis for Carpenter Ranch
P - Operations and Management Plan-Open Space Corridor
Q - Wetland Mitigation and Monitoring Proposal
R - Location of Proposed Water Quality/Hydromodificaion Basin
S - Certified Mail Receipts
T - MOU on Water Supply and Regional Water Management
U - Noise Modeling Showing Soft Approach
           

EIR/EIS - FINAL 

Cover-Title-Introduction           
Minor Modifications
Master Responses            
Responses-Intro
Federal Commenters
State Commenters
Local Commenters
Individual Commenters
Errata
References
List of Preparers


Findings of Fact and Statement of Overriding Considerations
Mitigation Monitoring and Reporting Program (MMRP) 

Additional Responses to Comments on the Draft Environmental Impact Report and the Final Environmental Impact Report Folsom South of U.S. Highway 50 Specific Plan Project

Contact Information

Scott Johnson, AICP
City of Folsom Community Development Department
50 Natoma St.
Folsom, CA 95630
Phone: 916-355-7223
sjohnson@folsom.ca.us