Report Cover and Table of Contents - 20KB
Report Sections
Section 1: Introduction - 28KB
Section 2: Site Characterization - 60KB
Section 3: Excavation and Waste Management - 80KB
Section 4: Confirmation of Waste Removal - 20KB
Section 5: Post-Closure Activities - 12KB
Section 6: Schedule - 20KB
Section 7: References - 16KB
Figures
Figure 1-1: Site Location – 448KB
Figure 1-2: Site Features – 4.8MB
Figure 1-3: Historical Aerial Photographs – 1.7MB
Figure 1-4: 1973 Aerial of Former Sewage Treatment Plant Aeration and Setting Ponds – 1.7MB
Figure 1-5: Landfill Plan Profile (1986) – 1.2MB
Figure 2-1: Topographic Map – 176KB
Figure 2-2: Floodplain Map – 272KB
Figure 2-3: Isohyetal Map – 420KB
Figure 2-4: Drainage Map – 272KB
Figure 2-5: Geologic Map – 192KB
Figure 2-6: North-South Geologic Cross Section – 452KB
Figure 2-7: Southwest-Northeast Geologic Cross Section – 448KB
Figure 2-8: DWR Well Search Results Map – 60KB
Figure 2-9: Longitudinal Cross Section – 292KB
Figure 2-10: Lateral Cross Section – 296KB
Figure 3-1: Hypothetical Construction Layout – 456KB
Figure 3-2: Excavate Flow Chart – 24KB
Appendices
Appendix A: Site History and Investigation Results – 4.4MB
Appendix B: State Water Resources Control Board (SWRCB) Joint Technical Document (JTD) Index and LEA Clean Closure Advisory – 60KB
Appendix C: Conceptual Site Model – 1.4MB
Appendix D: Community Relations Plan – 24KB
Appendix E: Air Monitoring Plan – 6.9MB
Appendix F: Confirmation Sampling and Analysis Plan – 1.7MB
Appendix G: Project Schedule – 28KB